www.heavensgatel2.fora.pl
Heavens Gate Lineage 2
The time now is Thu 17:42, 16 May 2024

tory burch boots Gezhouba Power Plant installation

 
Reply to topic    www.heavensgatel2.fora.pl Forum Index -> Forum testowe
View previous topic :: View next topic  

Author Message
px919557




Joined: 29 Jul 2010
Posts: 236
Read: 0 topics

Warns: 0/5
Location: qefrqn


PostPosted: Thu 7:38, 06 Jan 2011    Post subject: tory burch boots Gezhouba Power Plant installation

Gezhouba Power Plant installation of unit export safe and economic operation of circuit breakers


Converters, open, stop unit once, can be reduced by 4 times the switching operation of power plants, from 3F year's statistics show that power plants can reduce the number of action items for the 1040 (4F, 5F half), 3 All 6 units installed after GCB, about the year 3120 to reduce operating, greatly reducing the switching operation to run duty of labor intensity. 4.2 to further shorten the processing time of the accident Daichang 3 to 6 units of electricity due to protection malfunction or system failure tripping cutting machine, the protection only to jump in electrical power plants and export GCB switch outside the factory equipment is still running, so will reduce power plant operating personnel recovery (motor drive unit often due to loss of pressure or tachycardia causes shutdown), and the time outside the factory equipment, operating personnel in the unit within the shortest possible time recovery and network operation,[link widoczny dla zalogowanych], while processing the accident also reduced staff tension. To deal with an accident as an example: GCB is not installed, such as the above accidents, equipment inspection operations outside the plant to be 2, check the operation of power plants to be 2, check the operation to be 2 units,[link widoczny dla zalogowanych], recovery and auxiliary power plant about external device takes about 15rain. After the installation of GCB, because regardless of outside plant equipment,[link widoczny dla zalogowanych], auxiliary power and the restoration crew in advance 15rain and network, can be prone 2,062,006 hydropower plant automation on September 4 Section 109 of total electricity 31250kwh, 0.2 Yuan / kWh basis, one operation can have a direct economic benefit 06,[link widoczny dla zalogowanych],250 yuan. Unit personnel also check the operation for only 2 people can also be reduced by 4 persons / times, fewer people on duty that this is particularly important to run power plants. Table 2 Open,[link widoczny dla zalogowanych], shut down the date serial number of statistics on / off operation of the reasons 12003-04-21 stop 3FB automatic splitting machine changes to the outage (eliminating defects.) 220o3-04-24 and 220kV Ⅱ open 3FB home run power. 32003-05-08 stop 3FB automatically shut down the standby (cleaning). 42003-05-12 automatically shut down and I opened 3FB parent generation. 520o3-05-28 3F automatically stop running out to reserve units, 3B send down auxiliary power. 620o3-06 to open a Or7 3F and 220kVI home run power. 720o3-06-09 parked out to the unit 3F automatic backup solution, 3B send down auxiliary power. 820o3-06-10 to open the boot and 220kVI home run 3F. 92003-07-22 stop down manually 3F, 3B send down auxiliary power (034B installation cr). 1020o3 Or7-23 to open a boot and 220kVI home run 3F. l12003-09 automatic shutdown of a l1 stop 3F, 3B send down auxiliary power (for 035B cable tray overheating). 1220o3-09-12 On 3F of the plant shutdown automatically turned on and I home run. 132003-10-21 stop down manually 3F, 3B auxiliary power to send back (a small oil leak repair processing wheel.) 1420o3-10-23 to open the boot without pressure idling 3F manual (not strictly due to lower down the door.) 1520o3-10-23 stopped down manually backup 3F. 1620o3 a l1-05 to open the boot and 220kVI home run 3F. 1720o3 a l1-26 automatic shutdown stopped 3F, 3B send down auxiliary power (2 incidents tank drain.) 1820o3 a l1-30 to open the boot and 220kVI home run 3F. 1920o4-01-05 auto shutdown stop 3F, 3B send down auxiliary power (with 2F sand bottom intake and exhaust inlet check). 2020o4-01-08 to open the boot and 220kVI home run 3F. 2120o4-02-03 stop 3FB minor repairs. 242Oo4-02-16 to open the boot and 220kVI home run 3FB. 2520o4-02-22 auto shutdown stop 3F, 3B send down auxiliary power (with 2F trash rack replacement). 2620o4-02-23 to open the boot and 220kVI home run 3F. 272Oo4-04-12 to stop 3FB automatic splitting machines become outages. Mother with 220kV Ⅱ between 03 units and 33 units bus support insulator replacement. 282Oo4-04-14 to open the boot and 220kVI home run 3FB.
More articles related to topics:


ugg boots Gezhouba Second River Power Plant Monito

moncler jacken High pressure jet grouting technolo

mbt italia On the mean free path λ ^ -= 1 (√ 2


The post has been approved 0 times
Back to top
View user's profile

Display posts from previous:   
Reply to topic    www.heavensgatel2.fora.pl Forum Index -> Forum testowe All times are GMT + 2 Hours
Page 1 of 1

 
Jump to:  
You can post new topics in this forum
You can reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum

fora.pl - załóż własne forum dyskusyjne za darmo
Powered by phpBB © 2001, 2002 phpBB Group.
Theme Designed By ArthurStyle
Regulamin